Topped outHealthcare · Evanston · 2025
Northside Clinic
Outpatient clinic built beside a working hospital.
Build something like this- Size
- 64,000 sq ft
- Contract
- $17.9M
- Days on site
- 246
- Floors
- 9
- Client
- Northside Health
The brief
A nine-floor outpatient clinic built eight feet from a working hospital.
What made it hard
Vibration, dust and deliveries had to stay below limits set by the operating theatres next door.
How we built it
- Bored piles instead of driven piles
- Negative-pressure dust wall along the shared boundary
- Night deliveries through a single managed gate
The hospital never closed a ward, not for an hour.
Scope of work
- Piling01
- Structure02
- Medical gas03
- Clean rooms04
“They built nine floors next to a working hospital and we never closed a ward, not for an hour.”

Dr. Alan PriceDirector, Northside Clinic
0 days of ward closureMore projects.
- On site

- On site

- Handed over

Topped outHealthcare · Evanston · 2025
Northside Clinic
Outpatient clinic built beside a working hospital.
Build something like this- Size
- 64,000 sq ft
- Contract
- $17.9M
- Days on site
- 246
- Floors
- 9
- Client
- Northside Health
The brief
A nine-floor outpatient clinic built eight feet from a working hospital.
What made it hard
Vibration, dust and deliveries had to stay below limits set by the operating theatres next door.
How we built it
- Bored piles instead of driven piles
- Negative-pressure dust wall along the shared boundary
- Night deliveries through a single managed gate
The hospital never closed a ward, not for an hour.
Scope of work
- Piling01
- Structure02
- Medical gas03
- Clean rooms04
“They built nine floors next to a working hospital and we never closed a ward, not for an hour.”

Dr. Alan PriceDirector, Northside Clinic
0 days of ward closureMore projects.
- On site

- On site

- Handed over

Topped outHealthcare · Evanston · 2025
Northside Clinic
Outpatient clinic built beside a working hospital.
Build something like this- Size
- 64,000 sq ft
- Contract
- $17.9M
- Days on site
- 246
- Floors
- 9
- Client
- Northside Health
The brief
A nine-floor outpatient clinic built eight feet from a working hospital.
What made it hard
Vibration, dust and deliveries had to stay below limits set by the operating theatres next door.
How we built it
- Bored piles instead of driven piles
- Negative-pressure dust wall along the shared boundary
- Night deliveries through a single managed gate
The hospital never closed a ward, not for an hour.
Scope of work
- Piling01
- Structure02
- Medical gas03
- Clean rooms04
“They built nine floors next to a working hospital and we never closed a ward, not for an hour.”

Dr. Alan PriceDirector, Northside Clinic
0 days of ward closureMore projects.
- On site

- On site

- Handed over


10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782

10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782

10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782
On site
On site
Topped out
Handed over