Home
/
Services
Five trades, one contract.
Construction, renovation, roofing, design-build and fit-out, priced by trade and run by one crew.
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Licensed general contractor · IL #104-016782
Services
Five trades, one contract.
Construction, renovation, roofing, design-build and fit-out, priced by trade and run by one crew.
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Licensed general contractor · IL #104-016782
Services
Five trades, one contract.
Construction, renovation, roofing, design-build and fit-out, priced by trade and run by one crew.
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
02 · What we build
Five trades, one contract.
- 01
Construction
Ground-up commercial, residential and industrial buildings.
From $2M · 6–18 months
- Groundworks
- Steel & concrete frame
- Envelope
- Fit-out
- 02
Renovation
Kitchens, baths, whole homes and occupied buildings.
From $60K · 4–20 weeks
- Strip-out
- Structural changes
- Kitchens & baths
- Finishes
- 03
Roofing
Re-roofs, repairs and flat roofs with a 30-year warranty.
From $18K · 3–14 days
- Tear-off
- Decking
- Shingle, metal & flat
- Gutters & flashing
- 04
Design-build
Architect, engineer and builder under one contract.
From $400K · 8–14 months
- Feasibility
- Drawings & permits
- Fixed price
- Construction
- 05
Fit-out
Offices, shops and clinics made ready to open.
From $120K · 6–16 weeks
- Partitions & ceilings
- Mechanical & electrical
- Flooring
- Joinery
02 · What we build
Five trades, one contract.
- 01
Construction
Ground-up commercial, residential and industrial buildings.
From $2M · 6–18 months
- Groundworks
- Steel & concrete frame
- Envelope
- Fit-out

- 02
Renovation
Kitchens, baths, whole homes and occupied buildings.
From $60K · 4–20 weeks
- Strip-out
- Structural changes
- Kitchens & baths
- Finishes

- 03
Roofing
Re-roofs, repairs and flat roofs with a 30-year warranty.
From $18K · 3–14 days
- Tear-off
- Decking
- Shingle, metal & flat
- Gutters & flashing

- 04
Design-build
Architect, engineer and builder under one contract.
From $400K · 8–14 months
- Feasibility
- Drawings & permits
- Fixed price
- Construction

- 05
Fit-out
Offices, shops and clinics made ready to open.
From $120K · 6–16 weeks
- Partitions & ceilings
- Mechanical & electrical
- Flooring
- Joinery

02 · What we build
Five trades, one contract.
- 01
Construction
Ground-up commercial, residential and industrial buildings.
From $2M · 6–18 months
- Groundworks
- Steel & concrete frame
- Envelope
- Fit-out

- 02
Renovation
Kitchens, baths, whole homes and occupied buildings.
From $60K · 4–20 weeks
- Strip-out
- Structural changes
- Kitchens & baths
- Finishes

- 03
Roofing
Re-roofs, repairs and flat roofs with a 30-year warranty.
From $18K · 3–14 days
- Tear-off
- Decking
- Shingle, metal & flat
- Gutters & flashing

- 04
Design-build
Architect, engineer and builder under one contract.
From $400K · 8–14 months
- Feasibility
- Drawings & permits
- Fixed price
- Construction

- 05
Fit-out
Offices, shops and clinics made ready to open.
From $120K · 6–16 weeks
- Partitions & ceilings
- Mechanical & electrical
- Flooring
- Joinery

04 · How a job runs
A schedule you can hold us to.
Every job gets a week-by-week schedule before we break ground. You see it, we report against it every Friday, and the handover date goes in the contract.
40 weeks · Permit to keys
04 · How a job runs
A schedule you can hold us to.
Every job gets a week-by-week schedule before we break ground. You see it, we report against it every Friday, and the handover date goes in the contract.
40 weeks · Permit to keys
04 · How a job runs
A schedule you can hold us to.
Every job gets a week-by-week schedule before we break ground. You see it, we report against it every Friday, and the handover date goes in the contract.
01Weeks 0–8
Preconstruction
Drawings, permits and a fixed, itemised price.
02Weeks 6–14
Groundworks
Excavation, foundations and services in the ground.
03Weeks 12–26
Structure
Steel and concrete frame, floor by floor.
04Weeks 22–32
Envelope & roof
Walls, glazing and a watertight roof.
05Weeks 28–40
Fit-out & handover
Interiors, inspections, punch list, keys.
08 · A rough budget
Know the number before the meeting.
Three answers give you a range and a schedule. A fixed bid takes ten working days.
Estimate sheetGirder
01Job type
02Size
5,000200,000 sq ft
03Finish level
Rough budget
$6.8M–$8.7M
Schedule
about 34 weeks
Rough budget: $6.8M to $8.7M. Schedule: about 34 weeks.
Rough range from our last 40 jobs
Get a fixed bid08 · A rough budget
Know the number before the meeting.
Three answers give you a range and a schedule. A fixed bid takes ten working days.
Estimate sheetGirder
01Job type
02Size
5,000200,000 sq ft
03Finish level
Rough budget
$6.8M–$8.7M
Schedule
about 34 weeks
Rough budget: $6.8M to $8.7M. Schedule: about 34 weeks.
Rough range from our last 40 jobs
Get a fixed bid08 · A rough budget
Know the number before the meeting.
Three answers give you a range and a schedule. A fixed bid takes ten working days.
Estimate sheetGirder
01Job type
02Size
5,000200,000 sq ft
03Finish level
Rough budget
$6.8M–$8.7M
Schedule
about 34 weeks
Rough budget: $6.8M to $8.7M. Schedule: about 34 weeks.
Rough range from our last 40 jobs
Get a fixed bid09 · Questions
Ask before you sign.
Something else? Call +1 (312) 555-0164 or email bids@girder.build. We answer the same day.
A budget range within two working days of your drawings or a site visit. A fixed, itemised bid within ten working days.
BidsYes. The bid lists every trade and allowance. The price only changes when you change the scope, and you sign that change before any work starts.
BidsGirder is a licensed general contractor with $10M general liability and full workers' compensation. Certificates come with every bid.
BidsYou see the schedule every Friday. If a milestone moves, you hear it from us first, with the reason and the plan to recover it.
On siteUsually yes. We phase the work, seal each zone with a dust wall and clean the site at the end of every day.
On siteWe do. Permits, inspections and the certificate of occupancy are part of the contract.
On siteTwo years on workmanship, ten on structure and up to thirty on roofs, in writing, plus a walk-through at eleven months.
After handoverRenovations from $60K and roofs from $18K. Smaller than that, we will give you the name of someone good.
After handover
09 · Questions
Ask before you sign.
Something else? Call +1 (312) 555-0164 or email bids@girder.build. We answer the same day.
A budget range within two working days of your drawings or a site visit. A fixed, itemised bid within ten working days.
BidsYes. The bid lists every trade and allowance. The price only changes when you change the scope, and you sign that change before any work starts.
BidsGirder is a licensed general contractor with $10M general liability and full workers' compensation. Certificates come with every bid.
BidsYou see the schedule every Friday. If a milestone moves, you hear it from us first, with the reason and the plan to recover it.
On siteUsually yes. We phase the work, seal each zone with a dust wall and clean the site at the end of every day.
On siteWe do. Permits, inspections and the certificate of occupancy are part of the contract.
On siteTwo years on workmanship, ten on structure and up to thirty on roofs, in writing, plus a walk-through at eleven months.
After handoverRenovations from $60K and roofs from $18K. Smaller than that, we will give you the name of someone good.
After handover
09 · Questions
Ask before you sign.
Something else? Call +1 (312) 555-0164 or email bids@girder.build. We answer the same day.
A budget range within two working days of your drawings or a site visit. A fixed, itemised bid within ten working days.
BidsYes. The bid lists every trade and allowance. The price only changes when you change the scope, and you sign that change before any work starts.
BidsGirder is a licensed general contractor with $10M general liability and full workers' compensation. Certificates come with every bid.
BidsYou see the schedule every Friday. If a milestone moves, you hear it from us first, with the reason and the plan to recover it.
On siteUsually yes. We phase the work, seal each zone with a dust wall and clean the site at the end of every day.
On siteWe do. Permits, inspections and the certificate of occupancy are part of the contract.
On siteTwo years on workmanship, ten on structure and up to thirty on roofs, in writing, plus a walk-through at eleven months.
After handoverRenovations from $60K and roofs from $18K. Smaller than that, we will give you the name of someone good.
After handover
On site
On site
Topped out
Handed over