Home
/
Handed overIndustrial · Elk Grove · 2024
Depot 9
A distribution hall with a 40-foot clear height.
Build something like this- Size
- 220,000 sq ft
- Contract
- $12.3M
- Days on site
- 188
- Floors
- 1
- Client
- Northline Logistics
The brief
A 220,000 sq ft distribution hall with a 40-foot clear height.
What made it hard
The tenant's racking had to be in before peak season, whatever the winter did.
How we built it
- Tilt-up concrete panels cast on the slab
- Roof steel and deck closed in before the first snow
- Floor laser-screeded to a super-flat spec
Racking went in three weeks before peak season.
Scope of work
- Earthworks01
- Tilt-up panels02
- Roof steel03
- Super-flat slab04
“They gave us a date in January and handed us the keys on that date in July. In fifteen years of building depots that has happened once.”

Daniel OkaforCOO, Northline Logistics
Handed over on the dayMore projects.
- On site

- On site

- Topped out

Handed overIndustrial · Elk Grove · 2024
Depot 9
A distribution hall with a 40-foot clear height.
Build something like this- Size
- 220,000 sq ft
- Contract
- $12.3M
- Days on site
- 188
- Floors
- 1
- Client
- Northline Logistics
The brief
A 220,000 sq ft distribution hall with a 40-foot clear height.
What made it hard
The tenant's racking had to be in before peak season, whatever the winter did.
How we built it
- Tilt-up concrete panels cast on the slab
- Roof steel and deck closed in before the first snow
- Floor laser-screeded to a super-flat spec
Racking went in three weeks before peak season.
Scope of work
- Earthworks01
- Tilt-up panels02
- Roof steel03
- Super-flat slab04
“They gave us a date in January and handed us the keys on that date in July. In fifteen years of building depots that has happened once.”

Daniel OkaforCOO, Northline Logistics
Handed over on the dayMore projects.
- On site

- On site

- Topped out

Handed overIndustrial · Elk Grove · 2024
Depot 9
A distribution hall with a 40-foot clear height.
Build something like this- Size
- 220,000 sq ft
- Contract
- $12.3M
- Days on site
- 188
- Floors
- 1
- Client
- Northline Logistics
The brief
A 220,000 sq ft distribution hall with a 40-foot clear height.
What made it hard
The tenant's racking had to be in before peak season, whatever the winter did.
How we built it
- Tilt-up concrete panels cast on the slab
- Roof steel and deck closed in before the first snow
- Floor laser-screeded to a super-flat spec
Racking went in three weeks before peak season.
Scope of work
- Earthworks01
- Tilt-up panels02
- Roof steel03
- Super-flat slab04
“They gave us a date in January and handed us the keys on that date in July. In fifteen years of building depots that has happened once.”

Daniel OkaforCOO, Northline Logistics
Handed over on the dayMore projects.
- On site

- On site

- Topped out


10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782

10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782

10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782
On site
On site
Topped out
Handed over