118 apartments with a planted roof terrace.
Build something like this- Size
- 142,000 sq ft
- Contract
- $31.2M
- Days on site
- 338
- Floors
- 16
- Client
- Lakeview Housing Co-op
The brief
118 apartments and a planted roof terrace on a tight residential street.
What made it hard
Neighbours on three sides and a school across the road, so noisy work had a four-hour window.
How we built it
- Post-tensioned concrete frame poured in six-day cycles
- Bathrooms built as pods off site
- A mock-up apartment signed off before floor three
118 homes handed over with zero open defects.
Scope of work
- Concrete frame01
- Bathroom pods02
- Roof terrace03
- Landscaping04
More projects.
- On site

- Topped out

- Handed over

On siteResidential · Lakeview · 2026
Lakeview Residences
118 apartments with a planted roof terrace.
Build something like this- Size
- 142,000 sq ft
- Contract
- $31.2M
- Days on site
- 338
- Floors
- 16
- Client
- Lakeview Housing Co-op
The brief
118 apartments and a planted roof terrace on a tight residential street.
What made it hard
Neighbours on three sides and a school across the road, so noisy work had a four-hour window.
How we built it
- Post-tensioned concrete frame poured in six-day cycles
- Bathrooms built as pods off site
- A mock-up apartment signed off before floor three
118 homes handed over with zero open defects.
Scope of work
- Concrete frame01
- Bathroom pods02
- Roof terrace03
- Landscaping04
More projects.
- On site

- Topped out

- Handed over

On siteResidential · Lakeview · 2026
Lakeview Residences
118 apartments with a planted roof terrace.
Build something like this- Size
- 142,000 sq ft
- Contract
- $31.2M
- Days on site
- 338
- Floors
- 16
- Client
- Lakeview Housing Co-op
The brief
118 apartments and a planted roof terrace on a tight residential street.
What made it hard
Neighbours on three sides and a school across the road, so noisy work had a four-hour window.
How we built it
- Post-tensioned concrete frame poured in six-day cycles
- Bathrooms built as pods off site
- A mock-up apartment signed off before floor three
118 homes handed over with zero open defects.
Scope of work
- Concrete frame01
- Bathroom pods02
- Roof terrace03
- Landscaping04
More projects.
- On site

- Topped out

- Handed over


10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782

10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782

10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782
On site
On site
Topped out
Handed over