Handed overRenovation · Lincoln Park · 2026
Linden Kitchen
A dark galley kitchen opened into one bright room.
Build something like this- Size
- 620 sq ft
- Contract
- $184K
- Days on site
- 42
- Floors
- 1
- Client
- Raman family
The brief
A dark galley kitchen opened into one bright family room.
What made it hard
The family stayed in the house, and the wall we removed held up the floor above.
How we built it
- Temporary kitchen set up on day one
- Steel beam dropped in through the garden in a morning
- Dust wall and a daily clean before five
Six weeks, start to finish.
Scope of work
- Structural opening01
- Cabinetry02
- Stone island03
- Lighting04
“We lived in the house the whole time. The dust wall went up on day one and the site was swept every evening before we got home.”

Priya RamanHomeowner, Lincoln Park
Done in 6 weeksMore projects.
- Handed over

- On site

- On site

Handed overRenovation · Lincoln Park · 2026
Linden Kitchen
A dark galley kitchen opened into one bright room.
Build something like this- Size
- 620 sq ft
- Contract
- $184K
- Days on site
- 42
- Floors
- 1
- Client
- Raman family
The brief
A dark galley kitchen opened into one bright family room.
What made it hard
The family stayed in the house, and the wall we removed held up the floor above.
How we built it
- Temporary kitchen set up on day one
- Steel beam dropped in through the garden in a morning
- Dust wall and a daily clean before five
Six weeks, start to finish.
Scope of work
- Structural opening01
- Cabinetry02
- Stone island03
- Lighting04
“We lived in the house the whole time. The dust wall went up on day one and the site was swept every evening before we got home.”

Priya RamanHomeowner, Lincoln Park
Done in 6 weeksMore projects.
- Handed over

- On site

- On site

Handed overRenovation · Lincoln Park · 2026
Linden Kitchen
A dark galley kitchen opened into one bright room.
Build something like this- Size
- 620 sq ft
- Contract
- $184K
- Days on site
- 42
- Floors
- 1
- Client
- Raman family
The brief
A dark galley kitchen opened into one bright family room.
What made it hard
The family stayed in the house, and the wall we removed held up the floor above.
How we built it
- Temporary kitchen set up on day one
- Steel beam dropped in through the garden in a morning
- Dust wall and a daily clean before five
Six weeks, start to finish.
Scope of work
- Structural opening01
- Cabinetry02
- Stone island03
- Lighting04
“We lived in the house the whole time. The dust wall went up on day one and the site was swept every evening before we got home.”

Priya RamanHomeowner, Lincoln Park
Done in 6 weeksMore projects.
- Handed over

- On site

- On site


10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782

10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782

10 · Request a bid
Send us the drawings.
A budget range in two working days. A fixed, itemised bid in ten.
Bid requestTakes one minute
01What are you building?
02When do you want to start?
412 projects handed over · 96% on time · 1.2M hours without a lost-time injury
Or call +1 (312) 555-0164
Licensed general contractor · IL #104-016782
On site
On site
Topped out
Handed over